A challenging contract with tight deadlines and available budget but Top Mark Carpets stepped up to the mark…
Check out the case study and see photos of our work from this beautiful Dorset pub.
This job was a huge challenge due to the strict deadlines (pub waiting to open after complete refurbishment) and budget allocated to the flooring. The building, when taken over by the current owners, was very “tired” and seriously in need of modernising with some TLC fromTop Mark Carpets.
We worked hard with the client on choosing the materials as well as the design layout of the floor coverings. This project took, in total, around a week in man hours to complete for threeTop Mark Carpets tradesmen.
On several occasions, this required us to work well into the night and the dedication shown by the staff was second to none as always.
The end result was that we got the job done on time and the clients were over the moon with the end product and finish!